Case Studies

Bromsgrove Winding Services work with many clients across many different industries. See our most recent case studies below to explore the benefits of BWS.

HV Upgrade for a UK Glass Manufacturer

The Client

A client that manufactures high specification insulating glass sealed units and toughened-laminated glass.


The UK based company has a stringent commitment to quality at all levels from initial design through to manufacture and delivery.


The Brief


The company was looking to upgrade their HV infrastructure by replacing two existing HV transformers on site (TX2 & TX3). As a site with an annual load of close to 6,000,000 kWh they were also looking for ways to reduce overall annual electricity usage.


As a company with a reputation for excellence at all levels, from initial design through to manufacture and delivery, it was essential that any technologies implemented could be integrated without negatively impacting on business operations.


View the full case study by clicking here >>


Engineering a bespoke solution in the lowlands

The Client


A client based in the Central Lowlands of Scotland, part of a large international engineering group, recently required a bespoke engineered solution following the breakdown of the site’s transformer.


The client is the UK’s largest dedicated engineering service hub with a 75,000 square feet site housing dedicated servicing capabilities for valve, pump and renewable customers.


From this location the client specialises in providing a manufacturing, sales, and service hub for engineering services across the UK.


The Brief


Due to the size and demand of the site, the client relies on its transformer to keep the facility and its operations running on schedule.


So, when the site’s high voltage (HV) transformer broke down, it was imperative that it be made functional again as soon as possible. Research identified Bromsgrove Winding Services (BWS) could assist in refurbishing and rewinding the transformer quickly and an introduction was made by one of BWS’ approved introducers.


The project required a tight turn around time of no more than 6 weeks, as the client had several pumps that required testing before being despatched to the North Sea. 


View the full case study by clicking here >>

Contact Us